• 0

Project Consultancy, Reports & Profiles

·         Reasons for Starting a Business in Angola

While Angola may not be the first African country to consider when you're looking for investment opportunities. There are plenty of reasons why you should give it serious consideration. It's one of the fastest-growing economies globally, and that has attracted investors from around the globe who want to get in on the action while they can still get in under the radar. If you're looking to start a business in Africa, consider Angola as your next best option!

 

·         Opportunities across Industries

With an economy projected to grow by over 10% annually, plenty of opportunities exists across many industries. Some of these include construction, mining, and agriculture. The country is also rich with natural resources such as diamonds and oil reserves. This has attracted foreign investors who have helped boost growth in these sectors. As well as attracting investment, Market Opportunities. Oil and Gas. Energy. Agricultural Products. Angola- Agricultural Equipment. Transportation Aviation and Rail Import Requirements and Documentation. Political & Economic Environment. Political Environment.

 

·         Large Market Potential

The Angolan economy has been growing quickly, and its large market potential makes it an attractive location to set up shop. It's projected to be one of Africa's biggest economies by 2017, and you can get in on that success now with a stake in Angola's booming diamond industry. With diamonds already making up a significant part of Angola's GDP, there are many opportunities for growth in other sectors. As more people have money to spend, they will need goods and services—and your company is poised to provide them.

 

·         Increasing Foreign Investment

Foreign investment is crucial to Angola's growth, so it's good news that public-private partnerships are now being offered. Find out more about what it means and how you can take advantage of these opportunities. In addition, foreign investors may be eligible for exemptions from corporate income tax on their first three years of operation if they set up shop in designated industrial parks or areas with significant infrastructure deficits. In other words, there are several incentives to start your own business in Angola. If you're looking to expand internationally, we encourage you to learn more about Angola's offers.

 

·         There is a lot of Business Opportunity

The Angolan economy grows at 10 percent per year, with strong and stable macroeconomic growth. This is driven by abundant natural resources and untapped petroleum potential, and growing public spending. Also relevant are Angola's location, workforce, market size, and proximity to established markets in Southern Africa and Brazil are also relevant. The country has one of sub-Saharan Africa's largest and most rapidly expanding middle classes. The number of households with discretionary income will increase from 4 million today to 8 million in 2020, representing more than 30% of total households and 50% of urban households. In addition, Angola's population is young and fast-growing (with an average age of 17, which means that consumer demand will remain high for years to come.

 

·         What are the Natural Resources in Angola?

Angola has rich reserves of oil, diamonds, and uranium. They are also known to have abundant deposits of gas, bauxite, iron ore, tin, and other minerals. Some analysts also say that oil is another top natural resource as well. As you can see from all these resources, they have great potential in becoming one of Africa's most powerful countries over time, with great expectations being projected on them. These top ten reasons should give you a good insight into why so many people want to start a business here. There are more than enough opportunities to go around for everyone. The country has just started on its path toward development, and you can be part of it by starting your own business here.

 

·         Business-Friendly Policies and Government Initiatives;

The government's effort to develop and implement policies and programs that support small businesses is evident, particularly in some cities where prime areas have been reserved for micro, small and medium enterprises (MSMEs). Besides creating programs to support MSMEs, local governments put efforts into infrastructure development. They have also set aside land banks for residential subdivisions where qualified businesses can buy or lease lots. In addition, they are crafting initiatives that will help entrepreneurs save time when dealing with regulations and permits. These are just some of many reasons why it is easier to start a business in Davao City than anywhere else in Mind.

 

·         Market Size Angola

Angola has an estimated population of 24.2 million and is projected to grow at an annual rate of 2.1 percent over 2015-2030, reaching 28.5 million by 2030. (21 births per 1,000 people) and life expectancy (60 years) are two indicators that Angola will experience slower population growth than many other sub-Saharan African countries. This can be attributed to limited access to health care services and an increase from 4 million today to 8 million in 2020, representing more than 30% of total households and 50% of urban households. In addition, Angola's population is young and fast-growing, with high poverty levels. In addition, Angola's fertility rate declined from 5.6 children per woman in 1960 to 3.0 children per woman in 2010 as family planning programs have become more widely available.

 

·         Industrial growth in Angola

The country's economy continues to grow steadily, with Gross Domestic Product (GDP) expected to rise by about 4.5% in 2018 and 3.7% in 2019, following growth of 4.6% in 2017, driven by mining activities, especially diamonds and oil production. The level of activity remains quite elevated, particularly compared with other countries on Africa's west coast: industrial output and fixed investment continue growing steadily, and employment rates remain high.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Solar Power Plant
Solar Power Plant

Solar power is one of the most promising renewables. It is reliable and less vulnerable to changes in seasonal weather... Read More

Capacity :
1 MW
Plant and Machinery cost:
411.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
811.00Lakhs
Add To Inquiry Basket
Battery Operated Ride on Car for Kids
Battery Operated Ride on Car for Kids

A toy is an item that is used in play, especially one designed for such use. Playing with toys can be an enjoyable means... Read More

Capacity :
1000 Nos. /Day
Plant and Machinery cost:
115.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
549.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Lead Acid Battery
Lead Acid Battery

Profile: The lead-acid storage battery, an important energy storage device, is the most widely used secondary storage cell by automobile and other ... Read More

Capacity :
300000 Nos./Annum
Plant and Machinery cost:
416.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
56.00 %
TCI :
1327.00 Lakhs
Cost of Project :
1327.00Lakhs
Add To Inquiry Basket
BIODEGRADABLE PLASTIC PRODUCTS (BAGS, PLATES & GLASSES)
BIODEGRADABLE PLASTIC PRODUCTS (BAGS, PLATES & GLASSES)

Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consume... Read More

Capacity :
28125000 Nos./Annum Glass, 15000000 Nos./Annum Plates, 12857000 Nos./Annum Bags
Plant and Machinery cost:
145.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
49.00 %
TCI :
258.00 Lakhs
Cost of Project :
258.00Lakhs
Add To Inquiry Basket
Solar Photovoltaic System
Solar Photovoltaic System

Solar cell is made from two words, s... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Power Plant
Solar Power Plant

Solar thermal systems for generating electricity use tracking mirrors to reflect and concentrate sunlight on to a receiver, where, it is converted ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Laundry Soap
Laundry Soap

Soaps are salt of the fatty acids or mixtures of such salts. Their are two kinds of soaps namely water soluble and water insoluble. Soaps are prepa... Read More

Capacity :
2 Tonnes/Day
Plant and Machinery cost:
12.00 Lakhs
Working Capital :
23.00
Rate of Return (ROR):
33.99%
Break Even Point (BEP):
62.70 %
TCI :
61.00 Lakhs
Cost of Project :
61.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Graphite From Graphite Deposits
Start Production Of Graphite From Graphite Deposits

Graphite is a mineral that ... Read More

Capacity :
Graphite Powder 10 MT Per Day
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1998.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Cement Paper Bags with Printing Unit
Start Manufacturing Business Of Cement Paper Bags with Printing Unit

 

Cement Paper Bags with Printing are a popular ... Read More

Capacity :
Cement Paper Bag 50 Kgs Size 1,250 Th.Nos. Per Day Cement Paper Bag 25 Kgs Size 1,250 Th.Nos. Per
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
22800.00Lakhs
Add To Inquiry Basket
Setup Plant of  Biodegradable Corn Starch Granules, Bags, Plates & Cups
Setup Plant of Biodegradable Corn Starch Granules, Bags, Plates & Cups

Biodegradable corn starch products are a new innovation that ... Read More

Capacity :
-
Plant and Machinery cost:
440.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1427.00Lakhs
Add To Inquiry Basket
Setup Unit Of Aluminium Extrusion Plant
Setup Unit Of Aluminium Extrusion Plant

 

Aluminium extrusi... Read More

Capacity :
Aluminium Extruded Products 10 MT per day
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
901.00Lakhs
Add To Inquiry Basket
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully

Lead from galena refers to the ex... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)

Analytical testing labs are facilities that specialize in tes... Read More

Capacity :
-
Plant and Machinery cost:
410.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
646.00Lakhs
Add To Inquiry Basket
Invest In Kraft Paper From Pulp  Industry
Invest In Kraft Paper From Pulp Industry

 

Kraft paper, also... Read More

Capacity :
Kraft Paper 20 MT Per Day
Plant and Machinery cost:
2002.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
4040.00Lakhs
Add To Inquiry Basket
Start Carton Boxes Manufacturing Business
Start Carton Boxes Manufacturing Business

Carton boxes, also known as corrugated boxes, are commonly used in packaging and ship... Read More

Capacity :
Carton Boxes 40 MT Per Day
Plant and Machinery cost:
409.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
2071.00Lakhs
Add To Inquiry Basket
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant

 

Essential oils and oleoresins are concentrated... Read More

Capacity :
-
Plant and Machinery cost:
934.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1479.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Solar PV Glass
Start Manufacturing Business Of Solar PV Glass

Solar PV Glass, also known as photovoltaic gl... Read More

Capacity :
Solar PV (Photovoltaic) Glass 300 MT per Day
Plant and Machinery cost:
2800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
4150.00Lakhs
Add To Inquiry Basket
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)

Are you curious about what exactly a Truck Tr... Read More

Capacity :
Cost Estimation Capacity: Flatbed Trailer 6 Nos per Day Tipper Trailer 6 Nos per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1172.00Lakhs
Add To Inquiry Basket
Liquid Caustic Soda Industry (From Caustic Flakes)
Liquid Caustic Soda Industry (From Caustic Flakes)

Liquid caustic soda, also known as sodium hydroxide, is a powerful and versatile chem... Read More

Capacity :
Liquid Caustic Soda Lye 48% 80 MT Per Day
Plant and Machinery cost:
305.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
888.00Lakhs
Add To Inquiry Basket
A Business Plan For Red Oxide Pigment
A Business Plan For Red Oxide Pigment

Red oxide pigment, also kno... Read More

Capacity :
Red Oxide Pigment 200 MT Per Day
Plant and Machinery cost:
5081.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
6945.00Lakhs
Add To Inquiry Basket
A Business Plan For Linear Alkyl Benzene
A Business Plan For Linear Alkyl Benzene

Linear Alkyl Benzene (LAB) is a versatile chemical compound that pl... Read More

Capacity :
Linear Alkyl Benzene 20 MT Per Day
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
832.00Lakhs
Add To Inquiry Basket
Invest In Methylaniline Business
Invest In Methylaniline Business

Methylaniline is a clear to... Read More

Capacity :
Methylaniline 40 MT Per Day
Plant and Machinery cost:
730.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2056.00Lakhs
Add To Inquiry Basket
Invest In Alloy Wheel Business for Two Wheelers
Invest In Alloy Wheel Business for Two Wheelers

Alloy wheels for two-wheele... Read More

Capacity :
Alloy Wheel for 2 Wheeler 400 Pcs Per Day
Plant and Machinery cost:
157.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
802.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity :
-
Plant and Machinery cost:
1064.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
3229.00Lakhs
Add To Inquiry Basket
Most Profitable Business Idea of Triacetin Start Your Own Business of Triacetin
Most Profitable Business Idea of Triacetin Start Your Own Business of Triacetin

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business plan of Auto Piston
Manufacturing Business plan of Auto Piston

 

Automotive piston... Read More

Capacity :
0
Plant and Machinery cost:
348.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
2890.00Lakhs
Add To Inquiry Basket
Start manufacturing business of Chocolate
Start manufacturing business of Chocolate

 

Chocolate is a de... Read More

Capacity :
0
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
496.00Lakhs
Add To Inquiry Basket
Recycled Polyester Fiber from used PET Bottles Manufacturing Business
Recycled Polyester Fiber from used PET Bottles Manufacturing Business

 

Recycled polyester fiber is made by recycling ... Read More

Capacity :
Recycled Polyester Fiber 1,500,000 Kgs Per Annum
Plant and Machinery cost:
76.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
393.00Lakhs
Add To Inquiry Basket
Basic Voilet 10 (Rhodamine B Base) Production Business
Basic Voilet 10 (Rhodamine B Base) Production Business

Basic Violet 10 is a dye th... Read More

Capacity :
Basic Voilet 10 420 MT Per Annum
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
306.00Lakhs
Add To Inquiry Basket
Setup Steel Ingot from Scrap Business
Setup Steel Ingot from Scrap Business

Steel Ingot from Scrap come... Read More

Capacity :
Steel Ingot 3,000 MT Per Annum
Plant and Machinery cost:
445.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
1192.00Lakhs
Add To Inquiry Basket
Global and India Type 4 Cylinders Market
Global and India Type 4 Cylinders Market

Global and India Type 4 Cylinders Market, Growth Rate, Covid-... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start production of Disposable Plastic Cups, Plates & Glasses
Start production of Disposable Plastic Cups, Plates & Glasses

 

Disposable plastic cups, plates, and glasses are made from sustainable materials such as sugarc... Read More

Capacity :
-
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
442.00Lakhs
Add To Inquiry Basket
Ethyl Acetate from Ethanol Business plan
Ethyl Acetate from Ethanol Business plan

 

Ethyl acetate is a chemical compound that is used in a variety of industrial processes. It is commonly deriv... Read More

Capacity :
Ethyl Acetate: 6,000 MT. Per Annum
Plant and Machinery cost:
1131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2054.00Lakhs
Add To Inquiry Basket
Production business of  Silicon Carbide Abrasive Nozzle Liners
Production business of Silicon Carbide Abrasive Nozzle Liners

 

Silicon Carbide Abrasive Nozzle Liners (SCANL) are the latest breakthrough in abrasive technology, and they ... Read More

Capacity :
Silicon Carbide Abrasive Nozzle Liner: 10,000 Nos. Per Annum
Plant and Machinery cost:
178.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
454.00Lakhs
Add To Inquiry Basket
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine

 

Introduction:

"Donkey milk farming" is the practice ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Wire Nails
Manufacturing Business Of Wire Nails

Wire nails are a type of fastener typically used... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
A Business Plan for Aluminium Ingots from Aluminium Scrap
A Business Plan for Aluminium Ingots from Aluminium Scrap

Aluminium ingots from aluminium scrap are metal ... Read More

Capacity :
Aluminium Alloy Ingots: 6,000 MT per Annum Aluminium Scrap: 99 MT per Annum
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)

Cold Pressed R... Read More

Capacity :
Cold Pressed Rice Bran Oil (Edible Oil) : 270,000 Ltrs Per Annum
Plant and Machinery cost:
20.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Setup Plant Of Super Absorbent Polymer
Setup Plant Of Super Absorbent Polymer

Super Absorben... Read More

Capacity :
Super Absorbent Polymer: 30,000 MT Per Annum
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4900.00Lakhs
Add To Inquiry Basket
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant

What Are Silicon Carbide Abrasive Nozzle Liners? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Nicotine USP99+
Start Production of Nicotine USP99+

Nicotine USP99+ is a form of highly concentrated nicotine produced... Read More

Capacity :
-
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging

MS Barrels, also known as Metal Barrels, are specially designed containers used for p... Read More

Capacity :
MS Barrels (Metal Barrels): 210,000 Units Per Annum, MS Scrap: 300 Units Per Annum
Plant and Machinery cost:
148.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Industry Of Potato Starch
Start Industry Of Potato Starch

Potato starch ... Read More

Capacity :
Potato Starch 30 MT Per Day
Plant and Machinery cost:
329.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
894.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of NC Thinner
Manufacturing Business Of NC Thinner

Nitrocellulose thinning is a process where nitrocellulose (NC) is used to reduce the ... Read More

Capacity :
-
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
150.00Lakhs
Add To Inquiry Basket
Setup Own Business of Latex Mattress
Setup Own Business of Latex Mattress

 

Product:<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business

Product: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite

Sodium chlorite is a chemical compound with the formula NaClO2. It is a white crystalline solid, odourles... Read More

Capacity :
Sodium Chlorite (NaClO2) 15 MT Per Day
Plant and Machinery cost:
567.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
1892.00Lakhs
Add To Inquiry Basket
A Business Plan for Highway Guard Crash Barrier with Metal Beam  (Roll Forming) And Galvanizing Plant
A Business Plan for Highway Guard Crash Barrier with Metal Beam (Roll Forming) And Galvanizing Plant

Metal beam crash barriers, also known as guardrails, are an important safety feature on highways, bridges... Read More

Capacity :
Metal Beam Highway Crash Barrier 167 MT per day MS Sheet Scrap 33 MT per day
Plant and Machinery cost:
701.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2608.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash By Solvay Process (without using limestone)
A Business Plan for Soda Ash By Solvay Process (without using limestone)

 

Soda ash, also known as sodium carbonate, is an essential chemical used in various industrial a... Read More

Capacity :
Soda Ash (Na2CO3) 200,000 MT Per Annum Ammonium Chloride (NH4Cl) 200,000 MT Per Annum
Plant and Machinery cost:
132500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
146900.00Lakhs
Add To Inquiry Basket
Engineered Building Steel Structure Manufacturing Business
Engineered Building Steel Structure Manufacturing Business

Pre-Engineered Building (PEB) Steel Structures are a type of building system used for... Read More

Capacity :
PEB Structure 40 MT Per Day Steel Scrap waste Product 2 MT Per Day
Plant and Machinery cost:
462.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Start Lithium Oxide From Lithium Ore Manufacturing Plant
Start Lithium Oxide From Lithium Ore Manufacturing Plant

Lithium oxide, also known as lithia, is a chemical compound c... Read More

Capacity :
Lithium Oxide 4 MT Per Day
Plant and Machinery cost:
578.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2808.00Lakhs
Add To Inquiry Basket
Start Maize Starch & Liquid Glucose Production Plant
Start Maize Starch & Liquid Glucose Production Plant

 

Maize starch is a white powder that is derived from the endosperm of the ma... Read More

Capacity :
-
Plant and Machinery cost:
3000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
12345678910...

Showing 121 - 180 of 529 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR